Close Menu
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
Facebook X (Twitter) Instagram
The Meridian Spy
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
The Meridian Spy
Home»News»Easter Travels: FG Removes Barriers On Lagos-Ibadan Expressway
News

Easter Travels: FG Removes Barriers On Lagos-Ibadan Expressway

meridianspyBy meridianspyApril 7, 2023No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Share
    

Share!

  • Share
  • Tweet

The Federal Controller of Works in Lagos State, Mr Umar Bakare, said on Thursday that steps had taken to ease travels on the Lagos-Ibadan Expressway, especially at construction sites, during the Easter holidays.

Bakare told the News Agency of Nigeria (NAN) on telephone that diversion points created on some sections of the expressway due to ongoing construction had been cleared.

According to him, all crash barriers around OPIC on the Ibadan-bound carriageway had been removed and the area opened up to enable free flow of traffic.

He said that an additional slip road had been created around the Kara Bridge section on the same side to ensure smooth travels out of Lagos.

The controller said the emergency measures were adopted because of some early morning impediments and surge in the vehicular movement outward Lagos.

He said that the construction works around OPIC had advanced, making it easy to quickly open all the four lanes to traffic.

”Three lanes are available and open to traffic around the Kara section for easier passage.

Share this:

  • Share on WhatsApp (Opens in new window) WhatsApp
  • Tweet

No related posts.

READ ALSO  INEC can say what it likes, ADC will contest 2027 – Babachir Lawal
Mr Umar Bakare
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
meridianspy

Related Posts

No ISWAP Blockade on Maiduguri–Damaturu Highway, Security Sources Clarify

April 18, 2026

Iran Closes Strait of Hormuz Over Continuous US Blockade

April 18, 2026

NELFUND Dismisses Reports of Student Loan Suspension

April 18, 2026
Search
Recent Posts
  • No ISWAP Blockade on Maiduguri–Damaturu Highway, Security Sources Clarify
  • NBC warns anchors against bullying guests, denying fair hearing
  • Iran Closes Strait of Hormuz Over Continuous US Blockade
  • NELFUND Dismisses Reports of Student Loan Suspension
  • Shevlux Media CEO and The MeridianSpy Publisher, Sunny Ibeh Jnr, Unveils New Book, The Mandate of a Generation
  • Surprise as Uba Sani Tackles Northern Ministers for Not Defending Tinubu’s Policies 
  • Offa Bank Robbery: Saraki Describes Criminal Charge as Politically Motivated from State
  • DG of ECN Appointed Youth Director of Renewed Hope Ambassadors
  • Hardship Remark: Only Citizens Can Fix Nigeria, Tinubu Replies Opposition
  • Tinubu Mocks Atiku’s Privatisation Record, Says he Tried to Privatise ADC
  • Tinubu Signs N68.32tn 2026 Budget, Extends 2025 Spending Timeline
  • Two Died as Underground Tank Explosion Rock Platuea
  • How Police  Repelled bomb attempt on govt facilities in Ondo
  • 2027: Why Tinubu’s ‘City Boy’ Movement failed in Southeast — Ejimakor 
  • Kwankwoso Can’t Pull Northern Votes, Apart Section of Kano -Atiku
Categories
  • Business
  • Education
  • Entertainment
  • Foreign
  • Health
  • Investigations
  • Lifestyle
  • News
  • Opinion
  • Politics
  • Sport
Access Bank DiamondXtra Season 16 Rewards
  • About us
  • Contact Us
  • News
  • Politics
  • Health
© 2026 All Right Reserved. Designed by Techjuno

Type above and press Enter to search. Press Esc to cancel.