Close Menu
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
Facebook X (Twitter) Instagram
The Meridian Spy
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
The Meridian Spy
Home»News»National Super Grid Construction to Commence Soon – FG
News

National Super Grid Construction to Commence Soon – FG

meridianspyBy meridianspySeptember 5, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
tariff, power, electricity
Share
Facebook Twitter LinkedIn Pinterest Email
Share
    

Share!

  • Share
  • Tweet

National Super Grid Construction to Commence Soon – FG

The Federal Government has disclosed plans to construct a super grid to end the incessant national power collapse.

The media aide to the Minister of Power, Bolaji Tunji, revealed this in a statement.

According to him, the power minister, Adebayo Adelabu, spoke in China where he attended the China-Africa Cooperation Summit.

Adelabu had condemned the national grid, saying its present state cannot support the vision for the power sector.

“If we look at the strength, the capacity and the age of our existing network on the national grid, it cannot really support our vision for the power sector hence the need for the construction of the Western and Eastern super grid.

“Though we have been on this since my resumption, I can also tell you that the President is in full support of this because this will improve our transmission network, stabilise the grid and also expand the capacity and the flexibility of the national grid,” he stated.

Adelabu said 90 per cent of the approval required is in place and would be concluded soon.

Recall, a former Minister of Power, Barth Nnaji, advocated for a super grid to end the incessant collapse of the national power grid.

Nnaji said the current national grid kept collapsing because it was not well structured.

 

Nnaji stated that the power ministry under his watch had years ago sought the approval of the Federal Executive Council to build what he called a super grid, a 765KV network that would rise above the existing 330 KV.

READ ALSO  Insecurity: 31 States Spend N252bn on Security in Six Months

According to him, the 765KV is large enough to take power from high-capacity plants like the Manbilla Power Plant.

He revealed that the country has yet to have a transmission network that could wheel power from Manbilla when completed.

“Another critical area in Nigeria’s power sector is the transmission network. I believe that having the national grid the way we have it still going to be a problem. First, it is not robust, and it is not well structured. My advocacy is for multiple grids, autonomous but connected to the national grid. So that the national grid still operates, and it will be more robust. It will begin to cure the regular incident of the failure of the national grid.

“When I was in government, we asked the Federal Executive Council to approve what we called a super grid, a 765KV network that will kind of rise above the existing 330KV network. Right now, Nigeria has 330KV and 132KV, but none of them is really robust. But the 765KV network will be very important to take power from power plants such as the Manbilla that has been on for a while. Over 10,000 megawatts of power will come from Manbilla. So, the question is, which transmission infrastructure will take that power suppose that we finish it now? We need a super grid to take that power so that Nigeria has the ability to take power from various plants and transmit it to wherever we want it,” he disclosed.

The Chairman of Geometric Power commended the incumbent power minister, Adebayo Adelabu, for reviving the super grid project

READ ALSO  Nigeria Launches Cloud Policy, Seeks $750m Investment in 24 Months

Share this:

  • Share on WhatsApp (Opens in new window) WhatsApp
  • Tweet

No related posts.

Bolaji Tunji
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
meridianspy

Related Posts

𝐋𝐚𝐠𝐨𝐬 𝐃𝐞𝐜𝐥𝐚𝐫𝐞𝐬 𝐓𝐡𝐮𝐫𝐬𝐝𝐚𝐲 𝐖𝐨𝐫𝐤-𝐅𝐫𝐞𝐞 𝐅𝐨𝐫 𝟐𝟎𝟐𝟔 𝐈𝐬𝐞𝐬𝐞 𝐃𝐚𝐲

August 19, 2026

N’Assembly has over 14,000 workers, busiest parliament in world — Clerk

August 19, 2026

How ADC worked with Accord to defeat APC –ADC Spokwsman

August 18, 2026
Search
Recent Posts
  • 𝐍𝐢𝐠𝐞𝐫𝐢𝐚𝐧 𝐎𝐧𝐢𝐨𝐧 𝐓𝐫𝐚𝐝𝐞𝐫𝐬 𝐑𝐞𝐬𝐮𝐦𝐞 𝐄𝐱𝐩𝐨𝐫𝐭𝐬 𝐓𝐨 𝐆𝐡𝐚𝐧𝐚
  • 𝐎𝐬𝐮𝐧 𝐏𝐨𝐥𝐥: 𝐀𝐜𝐜𝐨𝐫𝐝 𝐏𝐚𝐫𝐭𝐲 𝐒𝐩𝐞𝐧𝐭 𝐀𝐭 𝐋𝐞𝐚𝐬𝐭 ₦𝟒𝟎𝐁𝐧, 𝐅𝐚𝐲𝐨𝐬𝐞 𝐑𝐞𝐩𝐥𝐢𝐞𝐬 𝐃𝐚𝐯𝐢𝐝𝐨
  • 𝐀𝐫𝐬𝐞𝐧𝐚𝐥 𝐂𝐥𝐨𝐬𝐢𝐧𝐠 𝐈𝐧 𝐎𝐧 𝐃𝐞𝐚𝐥 𝐅𝐨𝐫 𝐄𝐳𝐫𝐢 𝐊𝐨𝐧𝐬𝐚
  • 𝐎𝐜𝐭𝐨𝐠𝐞𝐧𝐚𝐫𝐢𝐚𝐧 𝐊𝐢𝐥𝐥𝐞𝐝 𝐈𝐧 𝐄𝐛𝐨𝐧𝐲𝐢 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐭𝐲, 𝐏𝐨𝐥𝐢𝐜𝐞 𝐁𝐞𝐠𝐢𝐧 𝐏𝐫𝐨𝐛𝐞
  • 𝐋𝐚𝐠𝐨𝐬 𝐃𝐞𝐜𝐥𝐚𝐫𝐞𝐬 𝐓𝐡𝐮𝐫𝐬𝐝𝐚𝐲 𝐖𝐨𝐫𝐤-𝐅𝐫𝐞𝐞 𝐅𝐨𝐫 𝟐𝟎𝟐𝟔 𝐈𝐬𝐞𝐬𝐞 𝐃𝐚𝐲
  • 𝐃𝐞𝐥𝐭𝐚 𝐃𝐞𝐩𝐥𝐨𝐲𝐬 𝐍𝐞𝐰 𝐕𝐞𝐬𝐬𝐞𝐥 𝐓𝐨 𝐂𝐨𝐦𝐛𝐚𝐭 𝐎𝐢𝐥 𝐓𝐡𝐞𝐟𝐭
  • N’Assembly has over 14,000 workers, busiest parliament in world — Clerk
  • Tinubu Billed to Address World Leaders at 81st UN Assembly
  • No Alliance: Adeleke Denies ADC Role in Re-Election
  • Salary Crisis: NLC Warns of Fresh Health Sector Strike
  • Obi, Others Sign Peace Pact as 2027 Campaign Begins Today
  • Off-Cycle Polls: Jonathan Decries Govs’ Show of Force
  • How ADC worked with Accord to defeat APC –ADC Spokwsman
  • Tinubu Support Group Kicks Off 2027 Campaign With 3,000-Man Walk
  • How to Apply for FG Loan to Build, Buy a House
Categories
  • Business
  • Crime
  • Education
  • Entertainment
  • Environment
  • Foreign
  • Health
  • Investigations
  • Labour
  • Lifestyle
  • Metro
  • News
  • Opinion
  • Politics
  • Security
  • Sport
  • Technology
  • World news
Access Bank DiamondXtra Season 16 Rewards
  • About us
  • Contact Us
  • News
  • Politics
  • Health
© 2026 All Right Reserved. Designed by Techjuno

Type above and press Enter to search. Press Esc to cancel.