Close Menu
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
Facebook X (Twitter) Instagram
The Meridian Spy
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
The Meridian Spy
Home»Education»TETFund Bars Institutions with Delayed Projects from Accessing New Funding
Education

TETFund Bars Institutions with Delayed Projects from Accessing New Funding

meridianspyBy meridianspyJuly 30, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
TETFund
Share
Facebook Twitter LinkedIn Pinterest Email
Share
    

Share!

  • Share
  • Tweet

 

The Board of Trustees (BoT) of the Tertiary Education Trust Fund (TETFund) has barred beneficiary institutions with delayed intervention projects from securing approval for new projects under the Fund’s 2027 intervention cycle.

 

A statement released in Abuja on Wednesday by TETFund Director of Public Affairs, Abdulmumin Oniyangi, indicated that the Chairman of the BoT, Aminu Bello Masari, announced the decision while expressing concern over the continued failure of some beneficiary institutions to complete TETFund-sponsored projects within approved timelines.

 

Masari said the Board would no longer tolerate delays in the delivery of projects funded through TETFund interventions.

 

 

Elano Capsule

High BP Is Not A Disease Of The Blood. See Root Cause

A retired specialist exposes the true mechanical plumbing problem in your veins

Check it out

He noted that some institutions had attributed the delays to volatility in the prices of key building materials, including cement, reinforcement bars, sanitary fittings and electrical fittings.

 

According to him, the Board responded to the challenge in 2023 by introducing a special intervention line dedicated to completing distressed projects.

 

He said the initiative had yielded positive results, with many of the affected projects subsequently completed.

 

 

However, Masari expressed concern over the recurrence of delays, identifying a lack of continuity in project implementation following changes in the leadership of beneficiary institutions, as well as delays in processing payments to contractors, as major factors responsible.

READ ALSO  Tinubu Says End of ASUU Strikes Is Answer to Parents' Prayers

 

The BoT chairman warned that TETFund-sponsored projects must not be negatively affected by internal bureaucracy, administrative bottlenecks or politics within beneficiary institutions.

 

“To address the recurring problem, the BoT approved a number of measures for immediate implementation. Under the new directives, all beneficiary institutions are required to compile a comprehensive list of projects that have exceeded their planned completion periods by more than six months.

 

Other News

TETFund invests N116m in NOUN research to tackle cancer, diabetes, language barriers

UniAbuja showcases four TETFund-funded research projects on energy, health, migration

Why Sonny Echono is Nigeria’s education reformer-in-chief – Education Minister

“The institutions are expected to state the causes of the delays and propose practical remedies for completing the projects. The projects must also be ranked according to relevance and priority, with detailed costing for their completion,” he said.

 

The Board further directed beneficiary institutions to establish robust and effective supervision teams, with the active participation of their Physical Planning and Maintenance Departments.

 

“The teams are expected to ensure that projects are delivered on schedule, within approved costs and to the specified quality standards,” it added.

 

The BoT also directed institutions with delayed projects to prioritise their completion under their annual, zonal and high-impact intervention lines.

 

“Consequently, no new projects will be admitted from identified beneficiary institutions under the 2027 intervention cycle until the outstanding projects are addressed.

 

“The Fund will also deploy monitoring teams comprising members of the BoT and technical staff to conduct on-the-spot assessments of the affected projects. The teams will examine proposals submitted by affected beneficiary institutions on programmes for completing the outstanding projects.

READ ALSO  NYSC, European Union Deepen Partnership on Digital Skills Development

 

“The assessment exercises are scheduled to take place in August and September 2026, ahead of the BoT’s statutory meeting in October, where projects to be admitted under the 2027 disbursement guidelines will be considered.

 

“The measures are aimed at ending the recurring problem of delayed and distressed projects and ensuring that TETFund interventions deliver maximum value to Nigeria’s tertiary institutions,” the Board noted

Share this:

  • Share on WhatsApp (Opens in new window) WhatsApp
  • Tweet

No related posts.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
meridianspy

Related Posts

Mbah Seeks 6,580 Teachers, Others for Smart Schools Initiative

July 30, 2026

Tinubu Says End of ASUU Strikes Is Answer to Parents’ Prayers

July 29, 2026

NYSC, European Union Deepen Partnership on Digital Skills Development

July 28, 2026
Search
Recent Posts
  • TETFund Bars Institutions with Delayed Projects from Accessing New Funding
  • Inflation Is an Invisible Tax on Nigerians, Says FG
  • WTO Chief Backs Cardoso’s Reforms, Urges Nigeria to Sustain Fiscal Discipline
  • Police Arrest 50-Year-Old Man Over Alleged Defilement of Two Minors in Rivers
  • Atiku Remains Tinubu’s Strongest Challenger, ADC Chieftain Says
  • Oyo APC Governorship Aspirant Unveils Campaign Leadership for 2027 Race
  • Yoruba Group Calls for South-West Security Summit
  • Chinese Imports from Nigeria Rise by 81%, Embassy Reports
  • Mbah Seeks 6,580 Teachers, Others for Smart Schools Initiative
  • Atiku Urges Tinubu to Prioritise Hunger, Insecurity Over Political Opponents
  • Adeleke Reacts as Police Arrest Osun SSG, Five Others
  • Delta Government Orders Arrest of Attackers of Governor’s Aides
  • Anambra Hostel Collapse Survivor Recounts Leap from Second Floor
  • After Slamming Atiku, Obasanjo Hosts Obi Amid 2027 Realignment
  • Cross River LG Workers Protest 11 Months of Unpaid Salaries
Categories
  • Business
  • Crime
  • Education
  • Entertainment
  • Environment
  • Foreign
  • Health
  • Investigations
  • Labour
  • Lifestyle
  • Metro
  • News
  • Opinion
  • Politics
  • Security
  • Sport
  • Technology
  • World news
Access Bank DiamondXtra Season 16 Rewards
  • About us
  • Contact Us
  • News
  • Politics
  • Health
© 2026 All Right Reserved. Designed by Techjuno

Type above and press Enter to search. Press Esc to cancel.