Close Menu
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
Facebook X (Twitter) Instagram
The Meridian Spy
  • Home
  • News
  • Politics
  • Health
  • Business
  • Education
  • Opinion
  • Lifestyle
  • Entertainment
The Meridian Spy
Home»News»85 Million Nigerians Remain Without Reliable Grid Power – REA
News

85 Million Nigerians Remain Without Reliable Grid Power – REA

meridianspyBy meridianspyAugust 5, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
tariff, power, electricity
Share
Facebook Twitter LinkedIn Pinterest Email
Share
    

Share!

  • Share
  • Tweet

85 Million Nigerians Remain Without Reliable Grid Power – REA

The Managing Director and Chief Executive Officer of the Rural Electrification Agency, Abba Aliyu, has disclosed that more than 85 million Nigerians, representing about 40 per cent of the country’s population, still lack reliable access to grid electricity.

Aliyu also lamented Nigeria’s dependence on imported renewable energy equipment despite its abundant solar resources. He disclosed this on Tuesday in Abuja during the signing of a Joint Development Agreement between the agency and Ecotech Development Nigeria Limited to establish a solar panel and battery assembly and manufacturing facility in Nigeria.

Aliyu described the agreement as a major milestone in Nigeria’s renewable energy drive, saying it marked the first time a Tier-1 Chinese renewable energy company had committed to establishing manufacturing and assembly operations in the country.

He said although the REA had extended electricity to millions of previously underserved Nigerians through initiatives such as the Rural Electrification Fund, the Nigerian Electrification Project and the Distributed Access through Renewable Energy Scale-Up Project, the challenge of inadequate grid access remained significant.

“Over 85 million Nigerians, close to 40 per cent of our population, still lack reliable access to grid electricity. REA exists to close that gap,” he said.

Speaking on the country’s dependence on foreign-made solar equipment, Aliyu noted that virtually every solar installation in Nigeria relies on components manufactured abroad.

He said, “Every electrified community across Nigeria today tells the same quiet story. The panel on the rooftop was engineered abroad. The battery beneath it was assembled abroad. The inverter that ties it together was also manufactured outside the country.

READ ALSO  2027: Kano Senator Ditches Kwankwaso, Quits NDC for APC

“Nigeria supplied the roof, the need and the market, while someone else supplied the technology and equipment.”

According to him, the continued importation of solar equipment has deprived Nigeria of jobs, technical capacity and foreign exchange that could have been retained locally.

“Every dollar we spend importing solar modules is a dollar that could have been paid to Nigerian technicians or invested in Nigerian factories. We have been financing someone else’s industrial growth with our own electrification budget,” he added.

Aliyu explained that under the agreement, the REA, through its renewable asset management subsidiary, would facilitate the annual offtake of up to 200 megawatts of solar photovoltaic modules and 200 megawatt-hours of battery energy storage systems manufactured and assembled in Nigeria by Ecotech.

He clarified that the arrangement was a non-exclusive framework designed to promote local manufacturing and would not override existing public procurement regulations.

“This agreement is not a procurement mandate. Every transaction will still comply with our procurement rules and be judged on price, quality and reliability. We are not lowering the bar; we are widening who gets a fair opportunity to meet

it,” he said.

Share this:

  • Share on WhatsApp (Opens in new window) WhatsApp
  • Tweet

No related posts.

Power grid
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
meridianspy

Related Posts

Five ISWAP Bomb Experts Killed in Premature IED Explosion in Borno

August 5, 2026

Osun Governorship Race Tightens as Adeleke, Oyebamiji and Salaam Battle for Votes

August 5, 2026

Boeing 737 MAX 7 Receives FAA Flight Approval

August 5, 2026
Search
Recent Posts
  • Five ISWAP Bomb Experts Killed in Premature IED Explosion in Borno
  • 85 Million Nigerians Remain Without Reliable Grid Power – REA
  • Osun Governorship Race Tightens as Adeleke, Oyebamiji and Salaam Battle for Votes
  • Boeing 737 MAX 7 Receives FAA Flight Approval
  • Police Summon VeryDarkMan, Question AIG Over Allegations
  • TSC Crisis: Aviation Unions Threaten to Picket Airlines
  • Why Fubara Was Stopped from Seeking Second Term — Wike
  • BREAKING: Nigeria Commissions Africa’s First Barefoot Renewable Energy College
  • FG Launches Training for 4,000 Tractor Operators to Tackle Food Insecurity
  • Australia Raises Proposed Levy on Big Tech to Boost News Funding
  • Nollywood Actor Appeals for Support to Restore Maureen Okpoko’s Sight
  • NEPC Workers Dismiss Strike Reports, Affirm Industrial Harmony
  • 2027: Kano Senator Ditches Kwankwaso, Quits NDC for APC
  • Iran denies Trump’s claim of fresh US talks
  • Atiku faults FG over economy recovery claims
Categories
  • Business
  • Crime
  • Education
  • Entertainment
  • Environment
  • Foreign
  • Health
  • Investigations
  • Labour
  • Lifestyle
  • Metro
  • News
  • Opinion
  • Politics
  • Security
  • Sport
  • Technology
  • World news
Access Bank DiamondXtra Season 16 Rewards
  • About us
  • Contact Us
  • News
  • Politics
  • Health
© 2026 All Right Reserved. Designed by Techjuno

Type above and press Enter to search. Press Esc to cancel.