Share!
The Federal Ministry of Works has signed a contract with Infiouest International Limited for the construction of Section I of the third Renewed Hope legacy road from a point on the Enugu/Abakaliki/Ogoja Highway (Africa Trans-Sahara route) cutting across Cross River, Benue, Kogi, Nasarawa States and terminating in Apo in Abuja.
The awarded project which consists of the reconstruction of the existing jointed, asphalt concrete and laterite surfaced road pavements from Ndibe beach, traversing through Eke Market, Abaomege, Onueke, Achiagu, Umuoghara/Onu Nwafor, Ukwuachi, Ishieke, Odomoke before terminating at Mbeke in Ebonyi is section 1 of the third Renewed Hope Legacy Project spanning 118.85km and it is to be constructed on Continuously Reinforced Concrete Pavement (CRCP).
Speaking during the ceremony marking the contract execution held at the Federal Ministry of Works Headquarters Mabushi, Abuja, Minister of Works, Engr. Nweze David Umahi, thanked the President Bola Ahmed Tinubu for his inclusive leadership and for considerations of diverse perspective in the distribution of the dividends of democracy under his administration.
He stated that the Renewed Hope Legacy Project was strategic for boosting transportation ecosystem along the economic corridors of the South East and North Central, noting that it would stimulate trade and agricultural development along the corridor and foster inter-regional cohesion, cooperation and collaboration, and create seamless movement of goods and services between the South East and Northern routes of the road.
He assured that the four (4) Renewed Hope Legacy Projects are not just transformational projects, but are critical investments that would turn around the socio-economic fortunes of the country, stimulate economic diversification and enhance a more sustainable transportation ecosystem.
He thanked Mr. President for carrying on the execution of the inherited road projects across the 6 Geo-Political zones, including the South East. He said, “Mr. President has engaged in four critical investments, which we call for Renewed Hope Legacy Projects. Lagos – Calabar 750 kilometers sections 1 and 2, construction already going on, going on very well. Despite all the envy and jealousy by people that even took us to court.
“But that project is a must. We’re supporting Mr. President to have that project accomplished. I’ve always said it’s not just a project. it is an investment. Very soon, we are starting 3A and 3B, which is in Cross River and Akwa Ibom. And then we’ll also start that of Ondo State. And so, we will accomplish all that. Of course, Mr. President is starting to accomplish all that.”
He further stated, “There is Sokoto-Badagry Superhighway, 1,068 kilometers. Two sections are already ongoing. The very lengthy one; the biggest any State got in these four legacy projects, is the Kebbi section, 258 kilometers. It’s ongoing. We’ve flagged off, and we have paid the first mobilization fee. The work is ongoing there, and of course, Sokoto, 120 kilometers. Work is also ongoing. We thank the President very much.”
In his speech, after signing the contract, the Managing Director/CEO of the company handling the project, Mr. Joseph Abou Jaounde promised to justify the confidence reposed on them.
He said, “Honourable Minister, first of all, I want to say thank you for the trust. I know this trust in Infiouest is a load on our shoulders. We have to carry on with this goal, and we have to prove that we trust in the right place.”